9th January 2008
29th January 2008
12th March 2008
18th March 2008
Construction of the concrete frame from Ground level to 5th floor due to be completed October 2008.
24th April 2008
8th May 2008
Ledite block wall
Generator in energy centre
The radiotherapy rooms comprise around 60,000 Ledite blocks which are made in the USA and are being laid by hand by some very strong operatives!
The blocks weigh between 26kg and 33kg each!